The Friday Afternoon Call: A Bobcat E20, a Concrete Drill Bit, and 48 Hours on the Clock
4:47 PM, Friday
The phone rang five minutes before I was going to head out. I remember glancing at the caller ID—Derek, a residential contractor I'd worked with a few times. Good guy. Punctual with payments, fair with his crew. But he never called on a Friday afternoon unless something had gone sideways.
"I'm in trouble," he said. No hello. Just that.
His main excavator—a mid-size machine, not a Bobcat—had blown a hydraulic pump on the site of a residential project. The job was supposed to break ground Monday morning. The pump needed to be ordered. Seven to ten business days. Derek had a narrow residential lot, a driveway that needed to come out, and a foundation to dig. His crew was standing around. His client was on a timeline.
"What do you have that's compact enough to get through a four-foot gate and strong enough to break up a hundred-year-old concrete driveway?" he asked.
I pulled up our inventory on the screen. "How soon do you need it?"
"Yesterday."
The Nice-to-Have That Became Essential
Here's the thing about rush orders: you learn pretty quickly that people don't call you when things are going according to plan. They call when the plan is in pieces on the ground. So you stop asking "what happened" and start asking "what do you actually need."
Derek needed three things, in order of urgency:
1. A compact excavator. His site had a narrow side access—a four-foot gate, mature trees, and a fence line he couldn't touch. The Bobcat E20 excavator was the obvious fit. It's a sub-2-ton machine that can squeeze through tight spaces without sacrificing dig depth. I had one on the lot.
2. A concrete drill bit. The driveway was reinforced concrete, 6 inches thick. Derek's crew had a breaker attachment, but the bit was shot. He needed something that would actually make progress on that slab without burning out another tool.
3. Something to run power tools. His genny—an older Champion generator—was working, but he admitted he'd never actually used an air compressor before. His new guy had brought one, and no one on the crew knew how to set it up properly. They were planning to use it for blowing out lines and prepping the surface, but it was sitting in the trailer unused.
That last part gave me pause. I'm not a small-engine mechanic, and I'm definitely not going to pretend I can walk someone through compressor troubleshooting over the phone. But I know enough to know that a compressor running without proper setup is a hazard, not a tool.
The Chain of Small Problems
Here's where the story gets interesting—and by interesting, I mean mildly frustrating.
The E20 was available. Great. The concrete drill bit was a different story. We had bits for full-size excavators, but the E20 takes a smaller attachment interface. My first thought was to check the parts catalog—which, if you've ever used a Bobcat parts lookup system, can either be your best friend or a rabbit hole depending on how specific your search is.
I found the right bit in the system. Backordered. Three to five business days.
Not acceptable.
I called a competing dealer—yes, we do that sometimes, because when a client is in a bind, the priority is getting them unstuck, not protecting your ego. They had one bit in stock. It was a return, slightly scuffed, but functionally fine. I arranged a transfer.
Then came the compressor question. Derek's guy had a mid-size compressor, the kind you'd find at a big-box store. I could hear the hesitation in Derek's voice when he described it. "It's got a regulator and a hose, but I don't know if it's set up right."
I told him what I know: don't guess. Check the manual. Set the pressure to the tool spec—not the compressor's max. Drain the tank before use. And if none of that makes sense, find someone who does this regularly before you start running air tools. A compressor isn't complicated, but it's also not the place for trial-and-error if you don't know what you're doing.
That's the part where my expertise runs out. I'm not an air compressor guy. What I am is someone who's seen what happens when equipment gets pushed into service without the right setup—and it usually involves a broken tool and a wasted afternoon.
The Saturday Morning Solution
By 9 AM Saturday, the E20 was loaded on a trailer. The concrete drill bit had arrived from the other dealer. Derek's crew met the driver at the site.
I didn't hear from him until Monday afternoon.
"It worked," he said. "The E20 fit through the gate. Bit chewed through the driveway faster than the old one ever did. And my guy figured out the compressor—turns out he was about to run it without draining the tank. Caught it before anything broke."
The project started Monday morning, only about six hours behind the original schedule. Derek's client never noticed the difference.
What I Took Away From This
The conventional wisdom in equipment rental is that customers want the biggest machine they can get for the money. In practice, that's rarely true. Derek didn't want the biggest Bobcat excavator on the lot—he wanted the one that fit through a four-foot gate without tearing up a lawn. The E20 wasn't a compromise. It was the correct tool for the job.
I also learned—or re-learned—that the checklist matters more than the equipment. Derek had a generator, a compressor, and a concrete drill bit. Two of those three things were sitting in his trailer, unused, because no one had bothered to confirm they were set up properly. The equipment wasn't the bottleneck. The lack of a pre-job check was.
Now, when I take a rush order, I ask a different set of questions. Not just "what do you need" but "what else do you have, and do you know how to run it?" It adds about three minutes to the call. It's saved a lot more than three minutes on the other end.
One more thing. Derek called me the following week to ask about attachments for the E20. Turns out he's thinking about buying one. His main excavator is back in service, but he liked having the option of a smaller machine that could get into places the big iron couldn't reach.
Sometimes a rush order turns into a longer conversation about what "right-sized" actually means.